Campaign calendar
Every single, announcement, asset drop, press embargo, and pitch deadline on one dated timeline.
Rollout Strategy
A dated campaign calendar that sequences singles, press, playlist windows, content, paid spend, and live moments into one compounding cycle — with a KPI attached to every phase.
Every single, announcement, asset drop, press embargo, and pitch deadline on one dated timeline.
Spend split across playlist, PR, paid social, and content, weighted by the phase each channel actually moves.
A repeatable short-form content system so the team knows what to shoot before the cycle starts, not during it.
Phase-level KPIs — saves, press tier, follower growth, ticket velocity — reviewed weekly and rebalanced.
Audience, catalog, and past-cycle audit to find where previous releases leaked momentum.
Single order, dates, and the story arc that connects them.
Asset checklist, budget map, and channel briefs handed to your team or ours.
Weekly reporting, reallocation, and a post-cycle read that feeds the next release.
It's the sequenced plan that takes a finished record to market: how many singles, in what order, on what dates, with which press, playlist, social, and live beats attached to each — plus the budget split and the success metric for every phase.
Twelve to sixteen weeks for a single-led album cycle. Anything shorter and long-lead press and editorial playlist windows close before you reach them; much longer and the audience loses the thread between drops.
Usually three. One to reset the sonic identity, one built for playlist and paid scale, one that carries the album's story into release week. The exception is an artist with a strong existing base, where two focused singles outperform three thin ones.
Yes. We frequently act as the strategy layer on top of an in-house team or a label's marketing department, owning the calendar and the reporting while your people execute.
A dated campaign calendar, budget allocation by channel, an asset checklist per beat, a content pillar plan, KPI targets per phase, and a weekly reporting rhythm against those targets.
Yes — we run the same framework for film and TV launches, game drops, and live-event announcements, swapping DSP beats for platform-appropriate ones.
8 min read
A 16-week album rollout framework: single sequencing, dated campaign calendar, budget allocation by phase, content pillars, and the KPIs to review weekly.
5 min read
How many singles to release before an album, how to sequence them, how far apart to space them, and when two outperforms three.
Book a strategy call and we'll map the first draft of your rollout calendar live.
Leave your email and we'll send back a tailored rollout strategy plan — no cost, no obligation.